Infrastructure

Metallizer Plant

GLS has significantly advanced the capabilities in coating to meet diverse requirements.

The general vacuum make Metallizer plant can achieve coating with a precision on a working width of 1200 mm with line speeds of up to 500mtrs/min translating to 7500 kms/month. This reflects that GLS is better placed to meet diverse industry specific application demands with stringent control on output.

  • Optical Density from 1.0 to 2.8
  • PET – 8.25 mic
  • BOPP – 15-25 mic
  • CPP – 20-35 mic